Step Into Our 1:1 Hotel Model

On-Site Showroom

Step Into Our 1:1 Hotel Model

Guestrooms, materials and craftsmanship are confirmed inside our factory before export — built for overseas EPC owners who need zero-surprise delivery.

1:1True full-scale build
100%Owner sign-off before production
30%Typical on-site rework savings

What we deliver

Six integrated capabilities that replace multiple vendors with one accountable EPC partner.

Interior design & shop drawings

Space planning, material boards, guestroom layouts and construction drawings aligned with your operator brand standards.

Custom hotel furniture manufacturing

Case goods, vanities, wardrobes, loose furniture and public-area millwork from our 70,000 ㎡ factory with batch QC.

1:1 full-scale showroom

Real-size hotel rooms in our factory for quotation alignment and approval of size, finish and hardware before mass production.

Site construction & installation

Self-owned crews for on-site fit-out and installation, with waterproofing and finishing details for humid and coastal markets.

Export packing & global logistics

Export cartons, container loading plans, shipping documents and port-to-site coordination.

After-sales & spare-parts support

Warranty response, replacement hardware and guidance for overseas housekeeping and maintenance teams.

Standard workflow

From design to mass production

Approve inside our factory first, then launch batch guestroom and public-area FF&E manufacturing.

1 2 3 4 5
  1. Design
  2. 1:1 Build
  3. Check
  4. Adjust
  5. Mass Produce
  1. 1Design
  2. 21:1 Build
  3. 3Check
  4. 4Adjust
  5. 5Mass Produce

Phase Comparison

Pick the contract phase that matches your opening rhythm — many projects start with Phase 1 only.

PhaseNameScope summaryWeeks
Phase 1 Phase 1 — Mock-up Approval & First Shipment Design coordination and shop drawing review 8–16
Phase 2 Phase 2 — Full FF&E Manufacturing & Delivery Full BOQ manufacturing (guestrooms, lobby, F&B as contracted) 12–24
Phase 3 Phase 3 — Turnkey Fit-out & Handover Everything in Phase 2, plus on-site fit-out coordination 16–36

Frequently Asked Questions

How phase-based EPC contracts work and what to send for a quote.

Can we start with Phase 1 only?

Yes. Many overseas projects begin with Phase 1 to lock mock-up standards, then expand to Phase 2/3 under addenda aligned to your opening schedule.

How do phases map to a hotel EPC contract?

Phases are commercial milestones — not separate vendors. One PM structure can cover Phase 1 mock-up through Phase 3 handover when scope is defined in the BOQ.

What do I send for a package quotation?

Room matrix, target opening month, destination port, operator brand standards or drawings, and preferred phase (1, 2 or 3).

Request a Phased EPC Quote

Send room matrix, destination port, opening month and preferred phase — scoped proposal within 24 hours.

Contact project desk

Step Into Our 1:1 Hotel Model

Reduce FF&E procurement and delivery risk for owners and contractors.

Zero Deviation

Real scene, real size, real effect — fully consistent with final project.

Save 30% Cost

Avoid on-site rework, reduce modification loss and control budget accurately.

Full Customization

Adjust layout, material and style freely until you are 100% satisfied.

Why leading brands choose 1:1 mock-ups

Compared with catalogue-only purchasing, YABO moves approval into the factory.

Visual approval

Traditional

Renderings and small swatches only

YABO 1:1 mock-up

Full-scale room — what you see is what ships

Change cost

Traditional

Costly on-site rework and delays

YABO 1:1 mock-up

Adjust in factory before batch run

Material sign-off

Traditional

Batch colour / grain mismatch

YABO 1:1 mock-up

Physical sign-off against mock-up

Overseas projects

Traditional

High cross-border coordination cost

YABO 1:1 mock-up

Video walk-through + checklist

TopicTraditionalYABO 1:1 mock-up
Visual approval Renderings and small swatches only Full-scale room — what you see is what ships
Change cost Costly on-site rework and delays Adjust in factory before batch run
Material sign-off Batch colour / grain mismatch Physical sign-off against mock-up
Overseas projects High cross-border coordination cost Video walk-through + checklist

What to approve during your visit

We recommend owners, designers and procurement leads complete this list together.

  • Room layout, circulation and case-good dimensions
  • Veneers, fabrics, hardware schedules
  • Lighting effect and feature-wall details
  • Minibar, wardrobe and vanity functions
  • Export packing and container loading plan
View overseas projects →