Interior design & shop drawings
Space planning, material boards, guestroom layouts and construction drawings aligned with your operator brand standards.
On-Site Showroom
Guestrooms, materials and craftsmanship are confirmed inside our factory before export — built for overseas EPC owners who need zero-surprise delivery.
Live showroom
Guestrooms, materials and craftsmanship confirmed inside our factory before export — built for overseas EPC owners who need zero-surprise delivery.
1:1 Mock-up · Three Core Markets
1:1 mock-up planning for Africa, the Middle East and Southeast Asia — climate specs, port workflows and tender deliverables.
Africa
Douala · Lagos · Tema
1:1 mock-up planning for humid climates — anti-termite specs, tropical substrates and Douala / Lagos / Tema port workflows before bulk FF&E.
Middle East
Dubai · Jeddah · Casablanca
Fire-rated FF&E mock-ups, operator brand audits and Gulf / North Africa port clearance — showroom planning before mass PO.
Southeast Asia
Manila · Bangkok · Jakarta · Singapore
Tropical humidity specs, resort outdoor corners and apart-hotel modular packages — 1:1 planning for Manila, Bangkok, Jakarta and Singapore corridors.
Six integrated capabilities that replace multiple vendors with one accountable EPC partner.
Space planning, material boards, guestroom layouts and construction drawings aligned with your operator brand standards.
Case goods, vanities, wardrobes, loose furniture and public-area millwork from our 70,000 ㎡ factory with batch QC.
Real-size hotel rooms in our factory for quotation alignment and approval of size, finish and hardware before mass production.
Self-owned crews for on-site fit-out and installation, with waterproofing and finishing details for humid and coastal markets.
Export cartons, container loading plans, shipping documents and port-to-site coordination.
Warranty response, replacement hardware and guidance for overseas housekeeping and maintenance teams.
Standard workflow
Approve inside our factory first, then launch batch guestroom and public-area FF&E manufacturing.
Three commercial milestones — mock-up approval, full FF&E manufacturing, turnkey fit-out handover. Scope defined by BOQ, not a furniture SKU catalog.
Phase 1
Lock finishes and dimensions in a 1:1 factory mock-up, then release the first production batch with export documents — ideal when opening dates are tight.
Typical 8–16 weeks
View scope & deliverables →
Phase 2
Series production for all guestroom types and public areas — batch QC, phased containers and port-to-site coordination.
Typical 12–24 weeks
View scope & deliverables →
Phase 3
Single-contract hospitality EPC: manufacturing plus site fit-out, installation sequencing, punch list and handover documentation.
Typical 16–36 weeks
View scope & deliverables →Pick the contract phase that matches your opening rhythm — many projects start with Phase 1 only.
| Phase | Name | Scope summary | Weeks |
|---|---|---|---|
| Phase 1 | Phase 1 — Mock-up Approval & First Shipment | Design coordination and shop drawing review | 8–16 |
| Phase 2 | Phase 2 — Full FF&E Manufacturing & Delivery | Full BOQ manufacturing (guestrooms, lobby, F&B as contracted) | 12–24 |
| Phase 3 | Phase 3 — Turnkey Fit-out & Handover | Everything in Phase 2, plus on-site fit-out coordination | 16–36 |
How phase-based EPC contracts work and what to send for a quote.
Yes. Many overseas projects begin with Phase 1 to lock mock-up standards, then expand to Phase 2/3 under addenda aligned to your opening schedule.
Phases are commercial milestones — not separate vendors. One PM structure can cover Phase 1 mock-up through Phase 3 handover when scope is defined in the BOQ.
Room matrix, target opening month, destination port, operator brand standards or drawings, and preferred phase (1, 2 or 3).
Send room matrix, destination port, opening month and preferred phase — scoped proposal within 24 hours.
Contact project deskReduce FF&E procurement and delivery risk for owners and contractors.
Real scene, real size, real effect — fully consistent with final project.
Avoid on-site rework, reduce modification loss and control budget accurately.
Adjust layout, material and style freely until you are 100% satisfied.
Compared with catalogue-only purchasing, YABO moves approval into the factory.
Renderings and small swatches only
Full-scale room — what you see is what ships
Costly on-site rework and delays
Adjust in factory before batch run
Batch colour / grain mismatch
Physical sign-off against mock-up
High cross-border coordination cost
Video walk-through + checklist
| Topic | Traditional | YABO 1:1 mock-up |
|---|---|---|
| Visual approval | Renderings and small swatches only | Full-scale room — what you see is what ships |
| Change cost | Costly on-site rework and delays | Adjust in factory before batch run |
| Material sign-off | Batch colour / grain mismatch | Physical sign-off against mock-up |
| Overseas projects | High cross-border coordination cost | Video walk-through + checklist |
We recommend owners, designers and procurement leads complete this list together.
Loading 360° viewer…
Could not load the 360° viewer. Please refresh and try again.